






Curated build guide
GS Wave Snow build guide
Some links on this page go to suppliers. We may earn a small commission if you buy through them, at no extra cost to you. It does not affect which parts we list. How we stay free →
Parts in this build
Build checkpoints
Plan parts here. Learn technique from the linked guides.
Checkpoint 1
Pair the dial and movement
Checkpoint: confirm the dial feet line up with the movement and any date/day window sits correctly before mounting.
Checkpoint 2
Set the hands
Hand-setting is the precision step. Review a full hand-setting guide before pressing the hands, then check clearance between the dial, hands, chapter ring, and crystal.
Learn this step
Checkpoint 3
Seat the movement in the case
Checkpoint: test-fit the movement/dial/hands assembly in the case, then confirm the movement holder or spacer seats cleanly before closing anything.
Learn this step
Checkpoint 4
Close the caseback
Checkpoint: inspect for dust, confirm the gasket is seated, then close the caseback without shifting the crown or movement.
Learn this step
Checkpoint 5
Fit the strap or bracelet
Checkpoint: fit the spring bars, then tug-test the strap or bracelet and confirm end links sit flush against the case.
Non-standard 19mm lug width — double-check your spring bars are the correct size before fitting.Learn this step
